sched/core: Remove unnecessary unlikely() in push_*_task()

WARN_ON() already contains an unlikely(), so it's not necessary to
use WARN_ON(1).

Signed-off-by: Yangtao Li <tiny.windzz@gmail.com>
Signed-off-by: Peter Zijlstra (Intel) <peterz@infradead.org>
Cc: Linus Torvalds <torvalds@linux-foundation.org>
Cc: Mike Galbraith <efault@gmx.de>
Cc: Peter Zijlstra <peterz@infradead.org>
Cc: Thomas Gleixner <tglx@linutronix.de>
Link: http://lkml.kernel.org/r/20181103172602.1917-1-tiny.windzz@gmail.com
Signed-off-by: Ingo Molnar <mingo@kernel.org>
diff --git a/kernel/sched/deadline.c b/kernel/sched/deadline.c
index b32bc1f..fb8b7b5 100644
--- a/kernel/sched/deadline.c
+++ b/kernel/sched/deadline.c
@@ -2042,10 +2042,8 @@
 		return 0;
 
 retry:
-	if (unlikely(next_task == rq->curr)) {
-		WARN_ON(1);
+	if (WARN_ON(next_task == rq->curr))
 		return 0;
-	}
 
 	/*
 	 * If next_task preempts rq->curr, and rq->curr
diff --git a/kernel/sched/rt.c b/kernel/sched/rt.c
index 9aa3287..e4f398a 100644
--- a/kernel/sched/rt.c
+++ b/kernel/sched/rt.c
@@ -1813,10 +1813,8 @@
 		return 0;
 
 retry:
-	if (unlikely(next_task == rq->curr)) {
-		WARN_ON(1);
+	if (WARN_ON(next_task == rq->curr))
 		return 0;
-	}
 
 	/*
 	 * It's possible that the next_task slipped in of