commit | 17cc6a7b8198ce84c6ffd5c6fc3a9dfbe2c183ef | [log] [tgz] |
---|---|---|
author | Marc Blank <mblank@google.com> | Mon Jun 28 16:07:36 2010 -0700 |
committer | android-build SharedAccount <android-build@sekiwake.mtv.corp.google.com> | Wed Jun 30 13:27:14 2010 -0700 |
tree | fb518da38845eb05e71bfd4a06912b5bb4cb3e9c | |
parent | 7a358316ae1c52fadf7ce8470fc5d257d1a71eaa [diff] |
Fix regression in Exchange calendar attendee response * During the fix of a previous late-Froyo issue, a change was made that appeared superficially correct, but was semantically incorrect. This changed the sense of the test for whether a reply email was required and caused the referenced bug. * The trivial fix is to replace the test with the (older) proper one Bug: 2764551 Change-Id: I7c72366252cf0607aee31ee0d76aca96a7d5fc2b